Zhuhai Port: Controlroom Night (5D)
Cinematographer: Shaina Anand
Duration: 00:12:14; Aspect Ratio: 1.778:1; Hue: 41.463; Saturation: 0.102; Lightness: 0.375; Volume: 0.174; Cuts per Minute: 4.331; Words per Minute: 11.115
A (M): We have it. Arranging the ship now. Wait a second... Bridge 3 bridge 3...
cctv
cctv
control center
control room
Zhuhai International Container Terminal, Gaolan
B (C): What's 42P3?
C (C): It just means regular container. 42 is the length (feet), P3 means "stool" container.
B (C): So it's just regular container. Do you know how the weight?
C (C): Let me check.
D (M): Are you missing 3 small containers?
C (C): It's 29 tons. It's too long. Don't you worry it might break?
D (M): There should be 60 big containers. Why do you have 76?
E (M): No need to wait anymore. We will give you instruction.
D (M): So have you figured it out with them?
C (C): Or you can also ask the driver how he loaded the truck.
(Mandarin): Can you do the R25 transfer shift?
(Mandarin) But I am loading the ship now...
(Cantonese) You asked him to load the ship?
(Cantonese) Yes.
(Mandarin): Well forget it, just continue to load the ship the
B (M): Can you do the R5 morning shift?
C:...
B (M): Well forget it, just continue to load the ship for now.
PTZ
contol center
control room
logistics
software
Pad.ma requires JavaScript.